Login|Register|Forget password|Dashboard Back to Home|Contact|Shopcart
Unverified1st Year

Shanghai Muhong Mechanical and Electrical Equipment Co., Ltd.  

Search
新闻中心
  • 暂无新闻
产品分类
  • 暂无分类
联系方式
  • 联系人:Joseph Fan
  • 电话:86-21-56031255
  • 传真:86-21-56031255
站内搜索
 
荣誉资质
  • 暂未上传
友情链接
  • 暂无链接
首页 > Products > Pipe Automatic Packing Machine
Pipe Automatic Packing Machine
单价 面议对比
询价 暂无
浏览 124
发货 Chinashanghai
库存 100
过期 长期有效
更新 2020-09-06 12:19
 
详细信息
Product Name: Pipe Automatic Packing Machine Model NO.: 21-168 Application: Pipe Packing Function: Packing of Pipes Type: Packaging Production Line Driven Type: Electric Packaging: Bundle Packaging Material: metal Usage: Packaging of Goods, Packing of Pipes Trademark: MH Transport Package: in Container Specification: 21-168 Origin: China Product Description this machine is for stacking of pipe≥Φ21mm, or accoring size rectangle pipesThis machine composed of Load (turn) device, Convey device, Pipe moving device, Stacker, Run out table, stock chain and hydraulic, electrical system.In working condition, all parts in sequential control by electrical system, to make whole line working automatically and continuously.After pipe stacking finish, horizontal rail starts, pipe moves out by longitudinal direction, when pipe end out stacking position, next stacking starts.Pipe packing machine located after buyer saw rail and run out chain, composed of Load (turn) device, Convey device, Pipe moving device, Stacker, Run out table, weighing device, stock chain, lifting device, lifting rail, rotating big plate and hydraulic, electrical system.After cutting, pipe enter convey rail, then onto Loading device(chain), there's adjustable block plate at end of Loading device, for locating pipe and make sure turning plate turn 1 pipe per time, turned out pipe slides onto convey device, and it counts 1 time/ turning 1 pipe, when pipe qty reaches certain amount, stops feeding and starts convey chain to send pipes to magnetic suckers working position, magnetic suckers falls to suck pipes, then lift-horizontal moving-falls-loose pipes and return to finish stacking of 1 layer pipes. It will align 1 time/2-3 layers pipes, when layers qty reaches certain amount, starts stacker and run out table horizontal rolls, pipes moves to strapping position driven by rail, according to strapping type, if auto strapping, pipes can move to strapping position, if manual strapping, pipes stop when out of stacking position. After strapping, starts run out rail again, pipe move to weighing position(stock chain position), after weighing, lift stock chain, starts chain to move pipes out of rail, and reach waiting position, this position can hold 2 pipe bundles, when 1st bundle reaches, start lifting chain to hold bundle, when 2nd bundle arrives, put down 1st bundle and lift convey rail, when covey rail hold bundle and lifts to highest position, starts rail to move 2 bundles to big rotating plate rail, and starts big rotating plate rail to rotate 90° to connect with buyer rail.Besides, when pipes out of stacking position, it can starts next bundle stacking.